The key decision

A comparable uninterruptible power supply quotation starts with critical load, power factor and inrush, backup time. Record the required result, site interfaces and acceptance evidence in one revision-controlled RFQ. IndustryApex engineers use these inputs to define the equipment, integration and OEM/ODM scope for your project.

Vertiv Liebert GXT5 rack tower UPS actual manufacturer equipment reference
Vertiv Liebert GXT5 rack/tower UPS family with battery arrangement · Manufacturer reference image.
Shown as a configuration reference. Availability and the equipment offered for your project are confirmed separately.

This uninterruptible power supply RFQ checklist is a working procurement document. Use it to turn the requirements in the Uninterruptible power supply equipment guide into a written project brief and a comparable equipment offer.

What should a quotation for uninterruptible power supply include?

Complete the product-specific requirements below. Keep buyer requirements, the proposed equipment response and unresolved points in separate columns. Attach the relevant drawings, samples or site records to the same RFQ revision.

Uninterruptible power supply RFQ requirements and quotation evidence
Requirement to define How to make the response comparable
Critical load Record the actual requirement, its supporting document and any unresolved point. Request a written response against the same requirement revision.
Power factor and inrush Provide the actual site information and connection boundary. Identify what IndustryApex supplies and what the installation site must prepare.
Backup time Record the actual requirement, its supporting document and any unresolved point. Request a written response against the same requirement revision.
Continuity requirement Record the actual requirement, its supporting document and any unresolved point. Request a written response against the same requirement revision.
Redundancy Record the actual requirement, its supporting document and any unresolved point. Request a written response against the same requirement revision.
Battery arrangement Record the actual requirement, its supporting document and any unresolved point. Request a written response against the same requirement revision.
Bypass and distribution Record the actual requirement, its supporting document and any unresolved point. Request a written response against the same requirement revision.
Monitoring Record the actual requirement, its supporting document and any unresolved point. Request a written response against the same requirement revision.
Heat and floor load Provide the actual site information and connection boundary. Identify what IndustryApex supplies and what the installation site must prepare.
Runtime transfer acceptance Agree the sample or case, measurement method, record and decision owner. Ask which evidence is included in the quotation.

How to compare uninterruptible power supply quotations

Return the same completed checklist to our engineering team when reviewing a revised offer. For each requirement, record the proposed configuration, included evidence, price boundary and open question. A blank response is an unresolved item; request clarification before treating two offers as equivalent.

  • Critical load: identify the requirement revision, the proposed response and the document that supports it.
  • Power factor and inrush: identify the requirement revision, the proposed response and the document that supports it.
  • Backup time: identify the requirement revision, the proposed response and the document that supports it.

Request separate scope lines for the main equipment, application-specific tooling or accessories, site connections, integration work, commissioning, training and support, where applicable. Record delivery terms, quotation validity and exclusions beside the quoted price. Keep optional items separate from items required for the stated result.

Uninterruptible power supply acceptance criteria: what must be agreed?

Use the following equipment requirements to frame the acceptance discussion:

  • Runtime transfer acceptance

Have the responsible engineering personnel agree the test case and method for the exact offered equipment. Record the input or sample identification, supplied configuration, observations or measurements, agreed decision criteria, open deviations and sign-off responsibility. Separate evidence available at the factory from checks that depend on the installed site. Retain the accepted records with the equipment and document later requirement changes.

OEM/ODM uninterruptible power supply: define the change boundary

Distinguish approved standard options, branding and documentation from mechanical, electrical, control or process development. Send the intended application, current drawings, target market, quantities and requested changes. IndustryApex engineers review feasibility and define the proposed supply and engineering scope. Agree design ownership where relevant, the validation responsibility and the evidence that will accept the changed configuration. A reference photograph does not define the offered configuration or grant rights to relabel the pictured brand.

Build your uninterruptible power supply project brief

Use the worksheet to record your inputs and open questions. You can download the brief or carry it into the project request. It is sent to IndustryApex only when you complete and submit that request form.

Complete your product-specific RFQ worksheet

You can edit the final requirements on the request form. No inquiry is submitted from this worksheet.

Use this brief in my project request ↗

Discuss the equipment scope with our engineers

Send the completed brief with the required result, destination and purchase timing. Our engineers can review the equipment configuration, application interfaces and requested customization, then identify the information still needed for a confirmed quotation.

Request a uninterruptible power supply quotation ↗ · Discuss OEM requirements · Discuss ODM engineering

Related equipment scope: Air source heat pump · EV AC charging station · EV DC fast charger.

Define your equipment requirements

Review the Uninterruptible power supply buying guide for the complete equipment scope.

Discuss this equipment project ↗ · OEM requirements · ODM requirements. Configuration and feasibility are reviewed for your application.

Frequently asked questions

What belongs in an RFQ for uninterruptible power supply?

Start with critical load, power factor and inrush, backup time. Complete the remaining product-specific requirements in the worksheet, and attach the relevant drawings, sample information and site records. State the destination, required result and purchase timing so our engineers can review a defined project.

How do I compare uninterruptible power supply quotations on the same basis?

Use the same requirement revision for each comparison. Record the proposed configuration, included evidence, required accessories or integration, commissioning responsibilities, delivery terms and exclusions. Request a written response to unresolved requirements rather than comparing the main equipment price alone.

What belongs in the uninterruptible power supply acceptance record?

Identify the approved input or sample, exact configuration, agreed method, observations or measurements, decision criteria, deviations and responsible sign-off. Agree with the responsible engineering personnel what can be checked at the factory and what depends on the installed site.

Can IndustryApex review OEM/ODM uninterruptible power supply requirements?

Yes. Send the application, requested changes, drawings, target market, quantities and acceptance requirements. IndustryApex engineers review the proposed equipment and engineering scope. Feasibility, validation work, commercial terms and delivery are confirmed for the agreed project; the reference photograph does not establish branding rights.

Reference information

  • Vertiv Liebert GXT5 5–20 kVA 230V product brochure
  • Vertiv Liebert GXT5 230V input/output installer and user guide

Reference data and images explain equipment configurations. IndustryApex engineers confirm the offered model, specification and commercial scope in your project quotation.

Keep exploring

Related buying guides

Move your project forward

Talk to our engineers.
Build your equipment solution.

Our engineers turn your application requirements into a technical proposal and equipment supply scope.

WhatsApp