Plan a greenhouse structure from the crop, local climate and approved site loads. Match spans, covering, vents and foundations with the cultivation and service layout, assigning structural and climate design responsibilities before comparing area-based equipment quotations. Inspect the as-built structure against approved drawings and material records, then test doors, vents, drainage and specified seals using agreed procedures. Record structural sign-off and equipment configuration. Climate or crop-production performance needs its own defined commissioning and agronomic assessment beyond acceptance of the structure shell. Submit the intended configuration and any OEM/ODM changes for project-specific feasibility review.
Plan a greenhouse structure from the crop, local climate and approved site loads. Match spans, covering, vents and foundations with the cultivation and service layout, assigning structural and climate design responsibilities before comparing area-based equipment quotations.

Shown as a configuration reference. Availability and the equipment offered for your project are confirmed separately.
Define crop and internal working layout
Provide growing system, crop height, beds or benches, equipment routes and the intended service spaces. The structure must accommodate cultivation and maintenance access. Covered area alone does not establish useful production space when columns, equipment, internal traffic or crop-clearance requirements are not included.
Establish site climate and design loads
Supply verified site wind, snow, temperature and other applicable design information through qualified engineers. Include exposure and any suspended equipment loads. A standard greenhouse family or photograph does not certify that a particular span and connection design is suitable for the buyer's location.
Match covering and ventilation objectives
Compare covering material, light transmission and the vent arrangement against the crop and climate strategy. Include screens, shading or other options only where specified. A structure shell and a climate-ready greenhouse are different scopes, so the design must identify what provides the required environmental control.
Design foundations drainage and interfaces
Provide geotechnical and site-level information for the responsible civil engineer. Define foundations, anchorage, stormwater and ground drainage with utility connections. Supply of steel or greenhouse modules does not automatically include local civil design, earthworks or a foundation suitable for unknown soil conditions.
Itemize equipment and installation boundaries
List doors, gutters, vents, drives, seals, fasteners and control interfaces with the selected layout. Separate irrigation, heating and other growing equipment from the shell where applicable. A complete visual rendering may show systems excluded from the quoted structure, so compare line-item responsibilities.
Plan corrosion inspection and replacements
State humidity, fertilizer/chemical exposure and maintenance access. Obtain material/coating identification and inspection guidance for joints, covering and drive components. Replacement covering or vent parts must match the engineered system, since a convenient substitution can change loads, sealing or movement behavior.
Compare a complete greenhouse structure system scope
| Decision | Information to compare |
|---|---|
| Define crop and internal working layout | Crop/growing method, clear height, beds/benches and internal routes |
| Establish site climate and design loads | Site climate, structural loads, exposure and suspended equipment |
| Match covering and ventilation objectives | Covering, light/climate objective, vents, screens and shading scope |
| Design foundations drainage and interfaces | Soil/site levels, foundations, anchors, drainage and utilities |
| Itemize equipment and installation boundaries | Doors/gutters/vents, drives/seals, included equipment and installation boundary |
| Plan corrosion inspection and replacements | Materials/coatings, chemical exposure, joint inspection and replacement components |
Plan installation and access
Qualified structural and civil specialists should approve site-specific drawings and foundations before assembly. Coordinate lifting, temporary support, covering installation and utility routes using the supplier's instructions. Verify the completed geometry, connections, drainage and vent movement with clear installation and inspection responsibilities.
Agree acceptance evidence before ordering
Inspect the as-built structure against approved drawings and material records, then test doors, vents, drainage and specified seals using agreed procedures. Record structural sign-off and equipment configuration. Climate or crop-production performance needs its own defined commissioning and agronomic assessment beyond acceptance of the structure shell.
Define OEM/ODM engineering boundaries
OEM bay layouts, covering options and equipment interfaces may be reviewed within a site-specific engineered design. ODM members, connections, span or load changes require structural validation. Reference imagery does not establish stock, universal destination approval or guaranteed crop output from a greenhouse design.
What should your greenhouse structure system RFQ include?
- Crop/growing method, clear height, beds/benches and internal routes
- Site climate, structural loads, exposure and suspended equipment
- Covering, light/climate objective, vents, screens and shading scope
- Soil/site levels, foundations, anchors, drainage and utilities
- Doors/gutters/vents, drives/seals, included equipment and installation boundary
- Materials/coatings, chemical exposure, joint inspection and replacement components
- Destination, working environment, access and delivery constraints
- Installation responsibility, utilities and connection drawings
- Acceptance samples, documented test method, operator training and maintenance scope
- OEM/ODM changes requested: identification, tooling, interfaces or new design; engineering feasibility to be confirmed
Need OEM / ODM customization?
Submit branding, packaging, configuration or engineering requirements for this equipment. Include the target market, initial and annual quantities, required changes and acceptance criteria.
Customization feasibility, permitted branding, development responsibilities, minimum quantity, cost and lead time are reviewed for the proposed supplier and configuration before a quotation is confirmed.
Frequently asked questions
How do I define crop and internal working layout?
Provide growing system, crop height, beds or benches, equipment routes and the intended service spaces. The structure must accommodate cultivation and maintenance access. Covered area alone does not establish useful production space when columns, equipment, internal traffic or crop-clearance requirements are not included.
How do I establish site climate and design loads?
Supply verified site wind, snow, temperature and other applicable design information through qualified engineers. Include exposure and any suspended equipment loads. A standard greenhouse family or photograph does not certify that a particular span and connection design is suitable for the buyer's location.
How do I match covering and ventilation objectives?
Compare covering material, light transmission and the vent arrangement against the crop and climate strategy. Include screens, shading or other options only where specified. A structure shell and a climate-ready greenhouse are different scopes, so the design must identify what provides the required environmental control.
How do I design foundations drainage and interfaces?
Provide geotechnical and site-level information for the responsible civil engineer. Define foundations, anchorage, stormwater and ground drainage with utility connections. Supply of steel or greenhouse modules does not automatically include local civil design, earthworks or a foundation suitable for unknown soil conditions.
How do I itemize equipment and installation boundaries?
List doors, gutters, vents, drives, seals, fasteners and control interfaces with the selected layout. Separate irrigation, heating and other growing equipment from the shell where applicable. A complete visual rendering may show systems excluded from the quoted structure, so compare line-item responsibilities.
How do I plan corrosion inspection and replacements?
State humidity, fertilizer/chemical exposure and maintenance access. Obtain material/coating identification and inspection guidance for joints, covering and drive components. Replacement covering or vent parts must match the engineered system, since a convenient substitution can change loads, sealing or movement behavior.
Reference information
- Richel Group Multi-span plastic greenhouse structure official product reference
- Richel Group greenhouse structure system official family or technical reference
Reference data and images explain equipment configurations. IndustryApex engineers confirm the offered model, specification and commercial scope in your project quotation.